The cost of the roster as well as a wages to turnover budget can be viewed at any stage during roster construction (assuming appropriate security access has been granted).

  1. Ensure the budget panel is visible. (See: User Interface - Information Panels)
  2. Press the Roster Cost button from the Calculate tab to calculate the cost of the roster and update the display to show both individual shift costs as well as total costs.
  3. Two elements of the display immediately change, 
    1. the first being that cost information is added to each shift.
    2. Secondly, the cost information is summarised and displayed in the budget panel